Kickwell patch 2 of 4 welded in

09/07/2018

Got the #2 panel trimmed, cleaned, and welded in. Added in some plug welds that connect to the torq box and subframe.

 

Popular posts from this blog

Flywheel, clutch, bell housing and some other details

dreaded tail shaft bushing replacement

Wire tuck and porportioning valve