Kickwell patch 1 of 4 is welded in

09/06/2018

Cleaned all the edges and welded in #1. Had to shape the 2 bend's in the vice and the rest was tacked and then hammer shaped.

 

Popular posts from this blog

Flywheel, clutch, bell housing and some other details

Oil pump and pick-up install