Kickwell patch 1 of 4 is welded in

09/06/2018

Cleaned all the edges and welded in #1. Had to shape the 2 bend's in the vice and the rest was tacked and then hammer shaped.

 

Popular posts from this blog

Cooling system install

Flywheel, clutch, bell housing and some other details

volt meter and fan delay button install