Kickwell patch 1 of 4 is welded in
09/06/2018
Cleaned all the edges and welded in #1. Had to shape the 2 bend's in the vice and the rest was tacked and then hammer shaped.
Cleaned all the edges and welded in #1. Had to shape the 2 bend's in the vice and the rest was tacked and then hammer shaped.

