Fitting the last piece of the pan

10/03/2018

Last piece is ready to be hammer formed to the frame rail on the left. Then I can tack the area around the sheet metal clamp. Then its trim, tack, hammer, repeat until we get to the trans tunnel under the gas pedal.
I may use a few self tap screws on the flange after its shifted all the way to the left.

Popular posts from this blog

Cooling system install

Flywheel, clutch, bell housing and some other details

volt meter and fan delay button install