Finished floor removal
06/22/2017
Finished all the floor pan removal and squeezed the rocker box to less then an 1/8 of flat which I can clamp closed while i weld. I need to slowly trim the tunnel and contour it to the new pan and the back of the pan actually tucks underneath the lip so I need to pop a few more spot welds to slid it in there.
Then wire cup grind, acid rust treatment, self etch primer everything and finally por15 all the seams before I drill all the spot weld holes. I will flap disc the weld sites but I want as much protection from rust as I can get in the seams.






Finished all the floor pan removal and squeezed the rocker box to less then an 1/8 of flat which I can clamp closed while i weld. I need to slowly trim the tunnel and contour it to the new pan and the back of the pan actually tucks underneath the lip so I need to pop a few more spot welds to slid it in there.
Then wire cup grind, acid rust treatment, self etch primer everything and finally por15 all the seams before I drill all the spot weld holes. I will flap disc the weld sites but I want as much protection from rust as I can get in the seams.





